Wednesday, October 15, 2008

Software partnership

Orange Gadgets and xWaves have formed a partnership for distributing and developing software and hardware for a GPS solution for the iPhone and iPod Touch.

Orange Gadgets will focus on hardware development and volume production of the iGPS360 module and will develop software utilities specific to the GPS functionality of the iGPS360 module. This software will be bundled with Xwaves' xGPS navigation software.

Xwaves will focus on development of the xGPS navigation software and implement full support for the iGPS360 module. Xwaves will also become a European distributor for the iGPS360 module.

With our combined efforts we hope to bring you the best GPS application and utilities for your iPhone and iPod Touch.

Note that Orange Gadgets will be handling the first production run orders for all people that have signed up on the pre-order list. The online store will go live later today so keep an eye on your mailbox and the blog.

Based on feedback from the housing supplier, the expected ship date as of now for the first modules will be 10/22/2008. Depending on what your database entry number is, your unit could ship at a later date.

Brief update (midnight 10/15/08): I am still working on properly securing the online store so it will be a little longer. I will post a new post once everything is ready to go. Thank you for your patience.

Sunday, October 12, 2008

Still counting...



We are still counting down...

Another week of hard work has passed and of course as usual there is the good news and the less good news. Let's get the less good news over first.

Last week I received a third sample set of the housing, expecting that this would be the last sample set before running the real production housings. Unfortunately, the housing was still not exactly as expected and more touch-up work needed to be done. The manufacturer promised to get new samples to me by past Thursday, but this did not happen. He told me on Friday noon that the mold was ready for sampling again, so I hope to get the fourth sample set on Monday. I will be on the phone with him first thing Monday morning for a status report. This will impact the ETA of October 15.

Now for the good news. On all other fronts things have been progressing very well!

I have received the first production sample boards back and all are fully functional! Production of the remaining boards is currently in full flow.

Regarding the online shopping cart, integration with the PayPal website took much more time than expected, but this morning I finally made a breakthrough and from the testing I have done so far, it looks like the shopping cart is now properly being transferred to PayPal.

Everyone who signed up on the pre-order list should be receiving an email later this week with an order-link to the online store. If you haven't signed up yet, now is the time to do it!

This week I have also been working on automated testing of the modules (every module is quality controlled before it is shipped). I have been working on hardware related to the testing as well as software. The photo above shows a test-board for simultaneous testing of 8 modules (if module through-put is not fast enough the test capacity of the board can be expanded). Besides electrical testing and visual inspection already done at the board fabrication and assembly house, complete functionality of the GPS module will be tested as well. This includes USB and dock connector interconnect functionality, back-up battery check, visual LED inspection, GPS check (TTFF and SNR) and A-GPS functionality.

In the meantime, let's keep our fingers crossed for the next sample set of the housing!

Thursday, October 2, 2008

Countdown



It's been a while and you probably have been wondering what is going on. Well, here is the latest update:

  • PCB panels/boards
    Last week I received the first PCB panel with 100 boards on it (see photo above). As some small changes were made compared to the previous revision, I wanted to make sure that the panels are fully functional before committing them to production. I separated two boards from the 100pcs panel and built a module with one of the GPS engines that I still had available. Everything turned out to be working great.

  • GPS engines
    The GPS engines also arrived last week and in order to make sure everything is OK with them as well, I assembled the second PCB board (from above) with the new production GPS engine. And guess what, everything is working as it is supposed to work.

  • Antennas
    The antennas shipped a bit earlier as expected and arrived just today. I will do an inspection of them and then they will be delivered to production.

  • Housing
    Last Friday, I also got the second set of samples of the housing. The logos are nicely touched up now and have a smoother finish than the rest of the housing, so they look really nice. Some other small things were not taken care of properly however and the mold will need another round of touch-ups. I am currently waiting for this new set of samples (expected tomorrow) before I can give the final approval to run production quantities.

  • Online store/shopping cart
    I have almost completed the online shopping cart, but still have some issues with properly integrating PayPal into the checkout procedure. I hope to fix those in the upcoming few days. Once that is done, the shopping cart will go online. For all of you who are curious, I will keep you guessing at what other items will be in the store besides the GPS module...

  • Shipping and handling
    I have also been getting ready to prepare for shipping of the modules to you. It's amazing how much overhead is involved in all this, from searching for envelops, labels, postage equipment, printing supplies to actually ordering all of them, both for domestic US shipping and international shipping. I hope I have got everything covered now.

The first fully assembled production parts are expected to become available next week. After that, each module will be fully tested before it is shipped out. The estimated date for shipping of the first modules will be around October 15.

As soon as modules come out of production and are tested, they will be shipped subsequently. Note that testing and shipping is going to take up most of my time starting next week, thus please understand that there can be some lag between the time you place your order and the time the module is actually shipped (as tested modules become available bit by bit from production). Once your order ships, you will receive a confirmation email.

Paid orders will be handled in sequence of how they are stored in the database. As of today, there will be enough units available in this first production run for everyone who has currently signed up on the pre-order list.