YOU CAN NOW ORDER A GPS MODULE BY CLICKING BELOW

Want anmodule?


Wish to become a distributor of the iGPS360 module?
Please send us an email at distributors@orangegadgets.com



Showing posts with label ABS. Show all posts
Showing posts with label ABS. Show all posts

Sunday, October 12, 2008

Still counting...



We are still counting down...

Another week of hard work has passed and of course as usual there is the good news and the less good news. Let's get the less good news over first.

Last week I received a third sample set of the housing, expecting that this would be the last sample set before running the real production housings. Unfortunately, the housing was still not exactly as expected and more touch-up work needed to be done. The manufacturer promised to get new samples to me by past Thursday, but this did not happen. He told me on Friday noon that the mold was ready for sampling again, so I hope to get the fourth sample set on Monday. I will be on the phone with him first thing Monday morning for a status report. This will impact the ETA of October 15.

Now for the good news. On all other fronts things have been progressing very well!

I have received the first production sample boards back and all are fully functional! Production of the remaining boards is currently in full flow.

Regarding the online shopping cart, integration with the PayPal website took much more time than expected, but this morning I finally made a breakthrough and from the testing I have done so far, it looks like the shopping cart is now properly being transferred to PayPal.

Everyone who signed up on the pre-order list should be receiving an email later this week with an order-link to the online store. If you haven't signed up yet, now is the time to do it!

This week I have also been working on automated testing of the modules (every module is quality controlled before it is shipped). I have been working on hardware related to the testing as well as software. The photo above shows a test-board for simultaneous testing of 8 modules (if module through-put is not fast enough the test capacity of the board can be expanded). Besides electrical testing and visual inspection already done at the board fabrication and assembly house, complete functionality of the GPS module will be tested as well. This includes USB and dock connector interconnect functionality, back-up battery check, visual LED inspection, GPS check (TTFF and SNR) and A-GPS functionality.

In the meantime, let's keep our fingers crossed for the next sample set of the housing!

Thursday, October 2, 2008

Countdown



It's been a while and you probably have been wondering what is going on. Well, here is the latest update:

  • PCB panels/boards
    Last week I received the first PCB panel with 100 boards on it (see photo above). As some small changes were made compared to the previous revision, I wanted to make sure that the panels are fully functional before committing them to production. I separated two boards from the 100pcs panel and built a module with one of the GPS engines that I still had available. Everything turned out to be working great.

  • GPS engines
    The GPS engines also arrived last week and in order to make sure everything is OK with them as well, I assembled the second PCB board (from above) with the new production GPS engine. And guess what, everything is working as it is supposed to work.

  • Antennas
    The antennas shipped a bit earlier as expected and arrived just today. I will do an inspection of them and then they will be delivered to production.

  • Housing
    Last Friday, I also got the second set of samples of the housing. The logos are nicely touched up now and have a smoother finish than the rest of the housing, so they look really nice. Some other small things were not taken care of properly however and the mold will need another round of touch-ups. I am currently waiting for this new set of samples (expected tomorrow) before I can give the final approval to run production quantities.

  • Online store/shopping cart
    I have almost completed the online shopping cart, but still have some issues with properly integrating PayPal into the checkout procedure. I hope to fix those in the upcoming few days. Once that is done, the shopping cart will go online. For all of you who are curious, I will keep you guessing at what other items will be in the store besides the GPS module...

  • Shipping and handling
    I have also been getting ready to prepare for shipping of the modules to you. It's amazing how much overhead is involved in all this, from searching for envelops, labels, postage equipment, printing supplies to actually ordering all of them, both for domestic US shipping and international shipping. I hope I have got everything covered now.

The first fully assembled production parts are expected to become available next week. After that, each module will be fully tested before it is shipped out. The estimated date for shipping of the first modules will be around October 15.

As soon as modules come out of production and are tested, they will be shipped subsequently. Note that testing and shipping is going to take up most of my time starting next week, thus please understand that there can be some lag between the time you place your order and the time the module is actually shipped (as tested modules become available bit by bit from production). Once your order ships, you will receive a confirmation email.

Paid orders will be handled in sequence of how they are stored in the database. As of today, there will be enough units available in this first production run for everyone who has currently signed up on the pre-order list.

Thursday, September 18, 2008

Housing mold and first production parts


On Wednesday I went to inspect the first production parts of the housing. I got a chance to take a few pictures of the production mold (see photo above). It's quite interesting to see how injection molded parts are made. The top and bottom of the picture show the housing bottom and top imprints on one side of the mold and the center circle is the feeding tube for the ABS plastic.

The manufacturer made about 25 sample parts for me to inspect and it looks like the housings came out very well. A few minor touch-ups on the mold itself are needed to perfect things a bit, but overall the parts already look very good (see picture below; you can click on it to zoom in a bit; due to the lighting condition of the photo, the zoom-in looks a little grainy). The eventual parts will be a matt over-all finish with a shiny imprint of the logos, just like the back of your iPhone.



I took five iGPS360 module boards with me to make sure all of them would fit the housings. Guess what.... all of them fit in perfectly so luckily no changes are required for PCB placement. I guess the time on housing design was well spent!

What else has been going on?

I have been working on getting the online shopping cart ready so you will be able to place your order pretty soon. You will be able to make payment through PayPal either with a PayPal account, or if you don't have a PayPal account, the PayPal site will give you the option to directly pay with your credit/debit card.

Regarding the iGPS360 module itself, the GPS engines are shipping next week and the tuned antennas the week thereafter. The PCB boards are expected back September 23 after which I will do verification testing before committing them to the reflow process which is scheduled for September 25. The assembled boards are expected back on October 8 so no change in ETA :)